Blackout at a petrochemical plant

Operations on the high-voltage electrical grid caused a power outage for several minutes in north-eastern France. Among those affected was a large petrochemical plant where several units were then at full production.

Background

The length of the blackout forced the operators to shut down production and ensure the safety of the equipment, employees and nearby communities.  

And rightly so: the various processes used were undergoing exothermic chemical reactions. Drastic measures were needed to avoid any thermal runaway. While the emergency generators avoided a disaster, material damage was observed. 

How Stelliant proceeded

A specialist loss adjuster of the Stelliant Group was sent to the petrochemical plant without delay, in order to guide and assist the policyholder in dealing with this large-scale claim. As the plant consumed a lot of energy, the emergency generators could not fully compensate for the power cut even though they had saved the day. The loss adjuster observed significant problems with the reactors, steam crackers, steam networks and even the support networks, etc. 

Following an extensive audit, he began to demonstrate the causal links between the power cut and the observed damage. This was meticulous work requiring coherent technical understanding and in-depth knowledge of chemical and electrical processes. Stelliant Group can rely on its specialist loss adjusters who have a wealth of professional experience in the industry. 

However, the damage was not just material. While the plant was partly paralysed, the policyholder suffered heavy operational losses. With a view on this aspect, a financial loss adjuster assessed the intangible damage. 

All in all, significant loss adjustment work was carried out for almost two years, requiring the wide array of expertise held by the Stelliant Group: electrical, mechanical, thermal, financial. During the claim, the loss adjusters showed a great deal of erudition and diplomacy to avoid the claim escalating into legal proceedings. An amicable solution was finally found through a settlement between the petrochemical company and the grid operator.