All Risks Construction and All Risks Prime Contractor, a solid know-how

Construction sites are characterised by their complexity and the amount of human and material resources they mobilise. As a result, they are subject to numerous hazards, despite the consequent safety measures. During the construction site (ARC) or during the assembly and testing of industrial equipment (ARPC), the risks of accidents…

Construction sites are characterised by their complexity and the amount of human and material resources they mobilise. As a result, they are subject to numerous hazards, despite the consequent safety measures. During the construction site (ARC) or during the assembly and testing of industrial equipment (ARPC), the risks of accidents are numerous, with certain consequences for the companies involved.

En savoir plus

ARC & ARPC guarantee, many risks

Construction sites bring a wide variety of players together. Construction and public works companies, principal contractors, project owners, builders, work package contractors, etc… all of these professions are exposed to a plethora of risks, from the time they start working to the day they deliver the project.

During the assembly and testing phase especially, any accident that occurs may cause material damage not just to the project or the existing structure, but also to the equipment and materials used for the site: tools, scaffolding, equipment, machinery, etc.

In addition, many different events can cause damage at a construction site:

  • Water damage
  • Fire
  • Subsidence or collapse
  • Defective material design or faulty use
  • Natural disasters: floods, earthquakes, landslides, storms, etc.
  • Electrical damage
  • Vandalism

In the event of an accident on a building site, Stelliant Loss Adjusting provides rapid assistance from one of its specialist experts in order to shorten the time needed to resume work as much as possible.

An intervention by specialist loss adjusters

After an incident occurs at a worksite, Stelliant Loss Adjusting immediately deploys its building site insurance experts. Their skills make them prepared to handle any construction problem, whether related to damage or worksite public liability.

Aware of the financial repercussions caused by a construction delay, their intervention is immediate and their methodology rigorous:

  • Technical management with the implementation of emergency measures and the organisation of the first contradictory meetings
  • The assessment of the loss and the determination of the damage, allowing our specialist expert to make an initial assessment of the loss.
  • Contractual analysis with examination of the specific clauses subscribed to by the company or the professional affected.

Once the initial findings have been made, our specialist adjuster looks for suitable and economically viable repair solutions, jointly developed with the other skills available within the Stelliant group.

A comprehensive offer for tailor-made support

Because the safety of a building site is a priority, Stelliant Loss Adjusting brings together specialist experts, with higher education but also qualified CRAC (Convention de Règlement de l’Assurance Construction). Their costing of repair works can be carried out by the construction economists of our subsidiary QANTEX.

At the request of our client, our teams can be organised in project mode in order to offer a complete response, combining complementary skills for a single claim covered by the ARC guarantee:

  • Advice and risk prevention with INQUEST consultants;
  • Project management and design with the geotechnical engineers of our subsidiary Geosynthese;
  • Rehabilitation and repair in kind by GEOP x PHENIX craftsmen and technicians.

As true partners of insurance professionals, our expert and administrative teams support each insured party involved, demonstrating transparency in the management of their case, for a pragmatic, sustainable and risk-free return to work.

key figures

40
locations
in France and overseas
150
loss adjusters
qualified CRAC
250
construction
loss adjusters