12.02.2024
Unreported damage when returning goods
Stelliant Expertise takes proactive measures upon discovery of damage unreported by the lessee when returning the vehicle. A joint appraisal meeting is organised to analyse the circumstances of the incident.
19.01.2024
Road crane overturn
Background On a construction site, a road crane overturned during a lifting operation. This incident resulted in the construction site being shut down for 10 days and the crane being…
03.08.2021
Construction site incident during tram line extension
A local authority decided to extend some tram lines. During the works, nearby businesses noticed an incident related with the works: a traffic roundabout and its 20-metre high reinforced earth…
03.08.2021
Telescopic handler accident at work site
A construction firm hired a telescopic handler from a speciality hiring company. During use, the telehandler tipped over but luckily no one was hurt.